PBXtech.info  
\'\'

Go Back   PBXtech.info > Nortel > Meridian systems

Reply
 
LinkBack Thread Tools Display Modes
Old July 19th, 2006, 03:59 PM   #1 (permalink)
trish
PBXtech SILVER 25+ posts
 
Join Date: Nov 2005
Posts: 36
trish is on a distinguished road
Replacing power supply on 2nd cabinet on Option 11

We have to replace a power supply on a 2nd cabinet on the Option 11. Do we need to back up, shut down or exactly what is the procedure? Thanks for your help.
trish is offline   Reply With Quote
Old July 19th, 2006, 04:20 PM   #2 (permalink)
Colin
PBXtech SILVER 25+ posts
 
Join Date: Feb 2004
Posts: 86
Colin is on a distinguished road
Re: Replacing power supply on 2nd cabinet on Option 11

yes i would do that

make sure you know what loops and DCH's are active just in case you need to re-enable them
backup then power off both cabs / replace the power supply then power on the 1st cab wait a few seconds the power up the 2nd cab
Colin is offline   Reply With Quote
Advertisement
 
Advertisement
Sponsored links

Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT -6. The time now is 10:57 PM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.0.0 RC6
Copyright ©2002 - 2007, PBXtech LLCAd Management by RedTyger

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37